Salem Steel Plant
Salem Steel Manufacturing Ltd.
Capacity
2.5 MW
Annual Generation
3,650,000 kWh
Cost Savings
₹2.92 Crores annually
CO₂ Reduction
3,175 tonnes annually

Challenge
The steel manufacturing facility was facing escalating energy costs that were impacting operational profitability. With 24/7 operations and high-energy machinery, the plant consumed approximately 9.5 million kWh annually. Additionally, they were experiencing significant peak demand charges and power quality issues that affected production. The company was also under pressure to reduce its carbon footprint to meet sustainability targets.
Solution
SquareGrids designed and implemented a comprehensive 2.5 MW solar power system using a hybrid approach of rooftop and ground-mounted installations. The system included 6,250 high-efficiency 400W monocrystalline panels, 25 string inverters, and an advanced energy management system integrated with the plant's existing infrastructure. The solution also incorporated peak load management capabilities and power quality improvement.
Implementation Approach
- 1Conducted comprehensive energy audit and load analysis
- 2Designed custom solution with phased implementation to avoid production disruption
- 3Installed 1.8 MW of rooftop solar across multiple buildings
- 4Deployed 0.7 MW ground-mounted system on available land
- 5Integrated with existing power systems and industrial controls
- 6Implemented advanced monitoring and analytics platform
- 7Provided operator training and maintenance protocols
Results & Benefits
Energy Generation
The system generates approximately 3,650,000 kWh of clean energy annually, offsetting 38% of the facility's total energy consumption.
Cost Savings
Annual energy cost savings of ₹2.92 Crores annually, with a 40% reduction in peak demand charges through strategic load management.
Return on Investment
Return on investment achieved in less than 4 years with continued benefits for the 25+ year lifespan of the system.
Environmental Impact
Reduction of 3,175 tonnes annually of CO₂ emissions, equivalent to planting approximately 52,000 trees each year.
"The SquareGrids team delivered a solution that exceeded our expectations. Not only have we significantly reduced our energy costs, but the improvement in power quality has led to fewer production disruptions. The detailed analytics has helped us identify additional efficiency opportunities we hadn't considered before."
Rajesh Kumar
Operations Director, Salem Steel Manufacturing Ltd.
Technical Details
Challenges Overcome
- Large facility with complex electrical infrastructure
- Need to maintain continuous operations during installation
- Structural limitations on some rooftops
- Integration with existing power systems and industrial controls
- Dust from manufacturing processes requiring specialized cleaning protocols
Key Features
- Hybrid rooftop and ground mount configuration
- Advanced energy management system
- Real-time monitoring and analytics
- Peak load management capabilities
- Power quality improvement
- Remote system control and management
- Custom mounting solutions for industrial rooftops
- Phased implementation approach
Related Industrial Projects
Explore more of our industrial energy solutions

Pioneer Manufacturing
1.2 MW solar installation with energy monitoring and load management.
View Case Study
Kovai Textiles
850 kW rooftop solar with specialized monitoring for textile machinery.
View Case Study
Fresh Foods Processing
600 kW solar with thermal integration for food processing facility.